| Panel
to Panel welding is done by TIG machine (Esab Make). Argon gas used in welding,
is of BOC make, quality of gas is ensured by the test certificate given by the
authorized supplier. Welding electrode (Tungston of (OD 1.2 mm ) is been purchased
from reputed supplier along with the test certificate.
For
the purpose of leak-testing, air pressure is regulated through inlet and outlet
valves to a level of 0.35Kg/Sq. Cm. Automatic pressure relief valves is used to
maintain the pressure inside the tank.
Sand blasting of specification SA
21/2 (ISO 8501-1 1988) is done. After sand blasting a primer (50
micron) of appropriate make, is applied within 4 Hrs after sand blasting.
In
Transformer tank, the Paint used is of reputed manufacturing company. Applicator
are being trained by authorised supplier of paint to maintain the quality of painting.
NDT (Non Destructive Test) is done to maintain the quality of Tanks.
Inside
of tank is being varnished, as required by customer to avoid any rusting. The
packing of Tank & Panels is done by wooden boxes, to avoid any damage during
transit.
| |
|