For
the purpose of leak-testing air pressure is regulated through inlet and outlet
valves to a level of 0.35 KG/ Sq. Cm . Automatic pressure relief valves is used
to maintain the pressure inside the tank
-
Sand
blasting of specification SA 2 1/2 (ISO8501-1 1988) is done .
-
After sand blasting a primer (50
micron) of appropriate make is applied within 4 hrs after sand blasting .
-
In transformer
tank the paint used is of reputed manufacturing company. Applicator are being
trained by authorized supplier of paint to maintain the quality of painting .
-
NDT (Non
Desctructive Test ) is done to maintain the quality of tanks.
-
Inside of tank is being varnised,
as required by customer to avoid any rusting .
-
The
packing of Tank & Panels is done by wooden boxes , to avoid any damage during
transit .